Shuwaikh Park (2-2) Total Area: 7,000 m² Scope of Works:

  • Benches: Installing 20 benches.

  • Walkways: Replacing approximately 200 linear meters of walkways.

  • Irrigation Network: Full replacement.

  • Children’s Play Area: Construction of a play area (20m x 20m).

  • Fence: Maintenance of 150 linear meters of the fence.