Nile Park (Part 1) Total Area: 10,150 m² Scope of Works:

  • Benches: Installing 50 new benches.

  • Waste Bins: Installing 50 waste bins.

  • Children’s Play Area: Construction of a play area including shades and rubber flooring (20m x 20m).

  • New Walkways: Approximately 12,000 linear meters.

  • Lighting: Installing 80 lighting poles.

  • Irrigation Network: Full installation.

  • Pump Room: Installing 3 pumps (Room 4 – 6* pumps).

  • Fence (Residential Side): Full maintenance of the fence facing the houses.

  • Agricultural Soil: 200 m³.

  • Landscaping: Full installation/planting of green areas (trees and shrubs).